Rotary joint installation knowledge

Release time:
Abstract:1. During handling and storage, the rotary joint s...
1. During handling and storage, the rotary joint should avoid impact and falling, so as not to damage the interface and internal parts.

2. Install the machine concentrically as much as possible to ensure the good operation of the rotary joint.

3. When installing a threaded rotary joint, pay attention to whether the thread direction of the inner and outer pipes corresponds to the rotation direction of the drum, and the thread rotation direction of the inner and outer pipes should also be the same.

4. The connection between the rotary joint and the pipeline must be connected by a hose (our company recommends using a metal hose with good disturbance), and rigid connection is absolutely prohibited.




5. The inlet and outlet of the rotary joint should be directly connected with the hose as much as possible. In order to reduce the auxiliary weight of the joint and prolong the service life.

6. In the assembly of the inner tube, pay attention to the matching of size and the auxiliary support of weight. It is recommended to use the tolerance fit of H8/e7 for the fit between the inner tube and the fitting of the internal rotary swivel joint.

7. The support and anti-rotation of the rotary joint should be appropriate. Generally, the diameter of the rod should be 2mm smaller than the anti-rotation hole, so as not to affect the free adjustment and compensation of the rotary joint.